Skip to main content
Large, Medium or Small, Your Design Data Needs Integrity, featured image

Large, Medium or Small: Your Design Data Needs Integrity

GSAS Engineering · · 1 min read

The challenges faced by today’s designers are rapidly increasing in scope and complexity. This leaves less time to properly organize, manage, and share the design data they create. Typically, unless they have access to dedicated IT resources, they are left with a choice.

They can either implement and maintain an ECAD data management system themselves or forgo the advantages of proper data management and live with the potential for errant design data propagating to manufacturing or, worse, to end-products delivered to customers.

Join us to get a first-hand look at these challenges and the solution to all of your ECAD data management needs.

Join us during this Live Webinar to experience the following:

  • Organizing libraries, designs, workflow, and collaborators in one place, allowing access and viewing of the data on any device, anywhere.
  • Maintaining design history – from component changes to manufacturing outputs and everything in between – and how to restore previous versions quickly and easily.
  • Creating new, inherently-organized, searchable, and parameter-rich components while ensuring availability, cost, and life cycle status.
  • Rapidly identifying and updating designs that rely on components with cost, availability, manufacturing, or reliability issues.
  • Effortlessly sharing and reviewing designs and collaborating with team members, managers, customers, and external service providers, in real-time, at any point in your design cycle.
  • Collaborating with MCAD designers using native integration with their tools.

Timing:

Tuesday, 23rd February 2021 | 02:30 PM to 03:30 PM

REGISTER NOW

LEARN MORE ABOUT Altium Tools

Also appears in:

Need embedded development tools?

Talk to our application engineers for personalized tool recommendations.

Stay in the Loop

Get monthly compliance updates, product insights, and engineering best practices delivered to your inbox.

Related Articles

DoIP handshake sequence between tester and DoIP entity: vehicle identification, TCP connect, routing activation request and the accept-or-reject response code with its denial causes, then diagnostic messages, from GSAS Micro Systems India
Automotive Ethernet Automotive & Mobility

DoIP Routing Activation Failures: The Response Code Table

A DoIP routing activation denial is one byte, and that byte names the cause exactly. This article puts every published response code in one table, cross-checked across the AUTOSAR Classic Platform DoIP specification, the Wireshark dissector and two open-source client libraries, then gives the order a DoIP entity applies its checks so you can read a denial backwards to the configuration value that produced it. Written by the GSAS Micro Systems engineering team in India for diagnostics and validation benches in Bengaluru, Pune, Chennai and Hyderabad.

29 Aug 2026 · 13 min read
Side by side vehicle outlines comparing a domain E/E architecture grouped by function against a zonal E/E architecture grouped by physical location, with zone controllers on an Ethernet backbone into central compute, from GSAS Micro Systems India
Automotive Ethernet Automotive & Mobility

Domain vs Zonal E/E Architectures Explained

Domain architectures group ECUs by function, zonal architectures group them by where they sit in the vehicle. This guide is the engineer's read on the difference: what physically moves, what the in-vehicle network has to become, and what happens to diagnostics, rest bus simulation and time sync. It also refuses to repeat the harness mass and ECU-count figures that circulate without a public source, and says exactly which claims are citable and which are not. Written by the GSAS Micro Systems engineering team in India.

29 Aug 2026 · 13 min read
The AUTOSAR network management state ring: Bus Sleep, Repeat Message, Normal Operation, Ready Sleep and Prepare Bus Sleep, with the wake transition marked; the governing timers for each exit are named in the article's sourced state table, from GSAS Micro Systems India
Automotive Ethernet Automotive & Mobility

ECU Testing over Ethernet: Startup, Shutdown and Wake

A bench that powers the ECU, waits for it to settle and then starts capturing has already skipped three of the four phases where integration defects live. This is the lifecycle version of ECU testing over Ethernet: what a ping does not prove, the AUTOSAR network management state set and the timers that govern it read out of the public specifications, why one node holds a whole cluster awake, and a phase-by-phase table of stimulus, observable, pass criterion and capture method you can write test cases from this week. Written by the GSAS Micro Systems engineering team in India.

29 Aug 2026 · 13 min read