AEL-5000 Series
Electronic LoadsGW Instek AEL-5000 programmable AC & DC electronic load, 20 models from 1.875 kW to 22.5 kW per unit, scalable to 180 kW single-phase and a 540 kW three-phase electronic load in parallel, with Turbo Mode and an AC Rectifier Load Mode for regenerative-grade load testing of UPS, inverters, fuses and breakers. Available in India from GSAS Micro Systems, the authorized GW Instek engineering partner.
Models
20 (1.875 – 22.5 kW per unit)
Voltage models
350 V / 425 V / 480 V (AC); 500 / 600 / 700 Vdc
Frequency
DC, 40 – 440 Hz (480 V models: 40 – 70 Hz)
Loading modes
CC, Linear CC, CR, CV, CP, AC Rectifier Load
Turbo Mode
2× current & power within 1 s
Crest factor
1.414 – 5.0
Phase angle control
Load / unload angle 0 – 359°
Parallel
Up to 8 units, 180 kW (1ϕ) / 540 kW (3ϕ)
Overview
About AEL-5000 Series
The GW Instek AEL-5000 Series is a programmable AC & DC electronic load for testing UPS systems, inverters, fuses and circuit breakers. The series spans 20 models, with single units from 1.875 kW to 22.5 kW across the 350 V, 425 V and 480 V voltage ratings, and up to eight units in parallel for single-phase loading to 180 kW or as a synchronised three-phase electronic load (Δ/Y) to 540 kW. Frequency coverage is DC and 40 – 440 Hz (the 480 V models cover 40 – 70 Hz), with loading and unloading phase-angle control from 0° to 359°. It is one of the highest-power programmable electronic load platforms GSAS Micro Systems supplies in India.

AEL-5000 AC & DC electronic load for UPS, inverter and protection-device testing
Unlike a DC-only load, the AEL-5000 is a true AC & DC electronic load: it operates from DC and across the 40 – 440 Hz AC range and provides six loading modes, constant current (CC), Linear CC, constant resistance (CR), constant voltage (CV), constant power (CP) and AC Rectifier Load. Loading and unloading phase-angle control (0 – 359°), SCR/TRIAC phase-modulation waveforms, and a Load-On-at-startup function let engineers verify the transient stability of an inverter or UPS exactly as a real appliance would stress it, including positive- or negative-half-cycle loading and inrush/surge conditions. As an AC electronic load it covers the test cases that a conventional DC load simply cannot.
| Specification | AEL-5000 Series |
|---|---|
| Number of models | 20 |
| Power per unit | 1.875 kW – 22.5 kW |
| Voltage models | 350 V, 425 V, 480 V (AC), 500 / 600 / 700 Vdc |
| Frequency | DC, 40 – 440 Hz (480 V models: 40 – 70 Hz) |
| Loading modes | CC, Linear CC, CR, CV, CP, AC Rectifier Load |
| Turbo Mode | 2× current and power within 1 second |
| Crest factor range | √2 – 5 (CC & CP mode) |
| Power factor range | 0 – 1, leading or trailing (lag or lead) |
| Phase angle control | Loading / unloading angle 0 – 359° |
| Parallel operation | Up to 8 units (1 master + 7 slaves), 180 kW (1ϕ) / 540 kW (3ϕ, Δ or Y) |
| Built-in measurement | Vrms, Arms, Watt, VA, VAR, CF, PF, IHD, VHD, ITHD, VTHD, Ipeak, Imax/Imin, Vmax/Vmin, time |
| Protection | Over-voltage warning, over-current, over-power, over-temperature |
| Interfaces (optional) | GPIB, RS-232, USB, LAN |
Specifications are sourced from the official GW Instek AEL-5000 datasheet and are subject to change by the manufacturer without notice.
Regenerative-grade load testing vs the dissipative AEL-5000: which do you need?
Engineers searching for a regenerative AC/DC load are usually looking for a high-power load that can either recover energy to the grid or simply absorb large AC and DC power reliably. It is worth being precise: the AEL-5000 is a dissipative load, not a grid-tied regenerative one, it converts the absorbed power to heat and is safeguarded by over-voltage, over-current, over-power and over-temperature protection across the whole series. For the vast majority of UPS, inverter, battery, fuse and breaker qualification work, a dissipative load delivers regenerative-grade load testing at the test points that matter, and the AEL-5000’s AC Rectifier Load Mode (below) covers the non-linear cases, at a fraction of the capital cost and grid-interconnection effort of a true regenerative system. If your duty cycle genuinely requires energy recovery, the GSAS team can advise on the right solution rather than over-specifying.
AC Rectifier Load Mode: non-linear UPS and PV-inverter efficiency testing
The dedicated AC Rectifier Load Mode reproduces the non-linear loading behaviour of switch-mode supplies and rectifier front-ends, simulating the real electronic equipment connected to a UPS or PV inverter. GW Instek specifies a Non-Linear mode for UPS efficiency measurement and a Resistive + Non-Linear mode for PV-inverter efficiency measurement, so both efficiency tests can be run on one instrument without assembling a separate non-linear load bank. Built-in test modes extend this to UPS efficiency, PV-inverter efficiency, UPS back-up time, battery discharge time, UPS transfer time, fuse/breaker trip / non-trip, short-circuit simulation, OCP and OPP workflows. For the exact efficiency standard your qualification programme targets, GSAS will confirm the test method against the current GW Instek datasheet.
Turbo Mode: 2× current and power for transient and short-circuit tests
Turbo Mode (selectable ON/OFF) lets the load withstand twice its rated current and power within one second. For tests that demand a brief surge of high power and large current, transient overload of protective components, fuse/breaker and AC-source short-circuit simulation, and OCP/OPP verification, Turbo Mode delivers the peak without sizing the load for that peak continuously, which is the most economical way to cover these cases. An adjustable bandwidth (BW) setting tames oscillation when the DUT and load bandwidths do not match.
The AEL-5000 model lineup
The 20 models are grouped by voltage rating; current and power scale with the model number, and Turbo Mode doubles both within one second. The table below shows the 350 V (50–350 Vrms / 500 Vdc) family, the 425 V (50–425 Vrms / 600 Vdc) and 480 V (50–480 Vrms / 700 Vdc) families share the same power/current steps under matching -425- and -480- part numbers.
| Model (350 V) | Rated current (Arms) | Power, Turbo OFF | Power, Turbo ON (×2) |
|---|---|---|---|
| AEL-5002-350-18.75 | 18.75 (56.25 Apeak) | 1.875 kW | 3.75 kW |
| AEL-5003-350-28 | 28.0 | 2.8 kW | 5.6 kW |
| AEL-5004-350-37.5 | 37.5 | 3.75 kW | 7.5 kW |
| AEL-5006-350-56 | 56.0 | 5.6 kW | 11.2 kW |
| AEL-5008-350-75 | 75.0 | 7.5 kW | 15.0 kW |
| AEL-5012-350-112.5 | 112.5 | 11.25 kW | 22.5 kW |
| AEL-5015-350-112.5 | 112.5 | 15.0 kW | 30.0 kW |
| AEL-5019-350-112.5 | 112.5 | 18.75 kW | 37.5 kW |
| AEL-5023-350-112.5 | 112.5 | 22.5 kW | 45.0 kW |
Higher single-unit power (15 kW, 18.75 kW, 22.5 kW) is reached on the 112.5 Arms models, and any single rating scales further by combining up to eight units in single-phase (180 kW) or as a three-phase electronic load (540 kW) parallel array. GSAS helps you select the voltage rating, per-unit power and parallel configuration that match your test envelope with margin.
Applications
The AEL-5000’s AC & DC loading, non-linear rectifier mode, Turbo Mode and parallel scalability make it well suited to:
- UPS testing: efficiency, back-up-time and transfer-time measurement with non-linear loading.
- Inverter and PV-inverter testing: resistive-plus-non-linear efficiency measurement, transient response, inrush and surge verification.
- Fuse and circuit-breaker qualification: trip / non-trip and short-circuit simulation with Turbo Mode and time measurement.
- AC power source and battery testing: discharge-time, OCP and OPP characterisation across DC and 40–440 Hz.
- High-power production qualification: single-phase 180 kW and three-phase 540 kW parallel arrays for power-electronics manufacturing lines.
Power-electronics teams testing UPS units, on-board chargers, solar and motor-drive inverters, and protection devices use the AEL-5000 for both bench characterisation and high-power production qualification, starting with a single chassis and scaling to parallel single-phase or three-phase arrays as test power grows. It is a core instrument for EV and energy-systems and industrial automation test programmes. To complete a UPS or inverter test bench, pair the AEL-5000 with the GW Instek ASR-6500 programmable AC source; for DC-only loading, the GW Instek PEL-5000G and PEL-3000A programmable DC loads cover the same workflows on the DC side.
Watch the AEL-5000 product introduction
AEL-5000 price in India: buy from GSAS Micro Systems
GSAS Micro Systems is the authorized GW Instek engineering partner in India. We supply the full AEL-5000 AC & DC electronic load range, all 20 models across 350 V, 425 V and 480 V ratings, with model selection and parallel-array sizing guidance, interface configuration, hands-on demonstrations, GST-compliant quotations, calibration with maintained traceability and post-sales application support. Power-electronics, UPS, inverter and protection-device teams across Bengaluru, Hyderabad, Chennai, Pune, Mumbai and Delhi NCR rely on GSAS for fast access and local support on this programmable electronic load in India. Contact GSAS or request a quote to get the AEL-5000 price in India and order with delivery nationwide.
Blog
GW Instek Insights
AI Data Center Testing: Power Shelves, Busbars, Burn-In and Optics
AI racks fail on the bench long before they fail in the field. How AI data center infrastructure is actually tested: server power shelves and CRPS supplies, 48V busbars, battery backup units, DC-DC stages, burn-in, thermal validation, high-speed switches, and optical transceivers, mapped to the GW Instek instruments GSAS supplies across India.
Testing High-Power UPS, Solar Inverters and Power Electronics: Inside the GW Instek AEL-5000 AC/DC Electronic Load
India's UPS, solar-inverter and power-electronics makers need load testing that behaves like the real world: non-linear, high-power and scalable. Here is how the GW Instek AEL-5000 AC/DC electronic load covers it, from 1.875 kW on the bench to 540 kW in a three-phase array.
Automated EV Charger Test Bench in India: GW Instek AC Source, DC Load and Battery Emulator
A walkthrough of an automated test bench that validates a CAN-controlled EV scooter charger across the full Indian grid envelope. GW Instek's APS-7200 AC source, PEL-3111AH DC load and GPP-7250 battery emulator combine with a Total Phase Komodo CAN Duo BMS emulator for unattended, repeatable charger validation, designed, integrated and scripted in India by GSAS.
Related products
More from GW Instek
All GW Instek products →
PEL-5000G Series
GW Instek PEL-5000G high power DC electronic load, a 1200 V programmable DC load with 4 kW to 6 kW per module across 150 V / 600 V / 1200 V families, Turbo Mode for 1.5x current and power, CV-mode parallel operation, Surge and BMS test modes, and 5-digit V/A/W readback. Available in India from GSAS Micro Systems with system sizing, parallel configuration and after-sales support.
View PEL-5000G Series →
PEL-5000C Series
GW Instek PEL-5000C high-power compact programmable DC electronic load, 150V / 600V / 1200V models, 6kW to 24kW per unit, up to 8 units in master/slave parallel for a 192kW electronic load, with CC/CR/CV/CP, dynamic, battery-test and solar-MPPT-test modes for EV charger, EV battery and solar panel validation. The high power DC load India teams choose for battery, charging-station and renewable-energy test, available from GSAS Micro Systems, the authorized GW Instek engineering partner, with application engineering, calibration and local support.
View PEL-5000C Series →
PEL-3000A Series
Programmable DC electronic load with up to 9.45 kW parallel capacity, 7 operating modes, 16A/us slew rate, and Go/NoGo testing. Available in India from GSAS Micro Systems.
View PEL-3000A Series →FAQ
Common questions about AEL-5000 Series
How much does the GW Instek AEL-5000 cost in India?
Is the AEL-5000 a regenerative AC/DC load or a dissipative load?
What makes the AEL-5000 different from a DC-only electronic load?
How many AEL-5000 units can run in parallel and at what total power?
What does the AEL-5000 AC Rectifier Load Mode do?
How do I buy the GW Instek AEL-5000 in India?
Interested in AEL-5000 Series?
Get pricing, an evaluation unit, or a technical consultation from our application engineers.